Back
Contractor Profile
STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING)
Government Contractor Profile & Statistics
Total Projects
17
Total Value
₱610M
₱608,287,919.33
Avg. Cost
₱36M
Avg. Progress
N/A
Project Status Distribution
Completed
17 projects
(100.0%)
Contract Value by Status
Completed
₱610M
₱608,287,919.33
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2024 | 3 |
₱140M ₱140,549,808.0 |
₱47M |
| 2023 | 5 |
₱210M ₱205,834,616.95 |
₱41M |
| 2022 | 9 |
₱260M ₱261,903,494.38 |
₱29M |
Projects by Region
Western Visayas
11 projects₱380M
₱379,091,711
Central Luzon
2 projects₱120M
₱117,691,031.22999999
NCR
3 projects₱95M
₱95,060,000
Cagayan Valley
1 project₱16M
₱16,445,177.1
Top 10 Provinces
1
11
Iloilo
₱380M
₱379,091,711
2
1
Pampanga
₱71M
₱70,651,739.38
3
1
Bulacan
₱47M
₱47,039,291.85
4
1
Batanes
₱16M
₱16,445,177.1
Top 10 Projects by Contract Value
1
Construction of Flood Mitigation Structure along Jalaur River, San Enrique, Iloilo (Section 2)
P00821142VS
Completed
San Enrique, Iloilo
₱96M
₱96,499,845.0
2
Construction of Slope Protection in San Enrique, Iloilo
P00733232VS
Completed
San Enrique, Iloilo
₱94M
₱94,086,502.0
3
Construction of Reinforced Concrete Slope Protection along Taug River, Angeles City, Pampanga
P00637021LZ
Completed
Cuayan, City of Angeles, Pampanga
₱71M
₱70,651,739.38
4
Construction of Groundsill / Revetment wall along Makati Diversion Channel (Phase 2), Barangay San Lorenzo, Makati City
P00632711LZ
Completed
San Lorenzo, City of Makati
₱49M
₱49,000,000.0
5
Construction of Flood Control Structure along Angat River (San Roque Section), Angat, Bulacan
P00726729LZ
Completed
Angat, Bulacan
₱47M
₱47,039,291.85
6
Construction of Groundsill / Revetment Wall along Makati Diversion Channel, Brgy. San Lorenzo, Makati City
P00637039LZ
Completed
San Lorenzo, City of Makati
₱39M
₱39,200,000.0
7
Construction of Flood Control along Jalaur River in Calinog, Iloilo
P00820388VS
Completed
Calinog, Iloilo
₱34M
₱34,299,950.0
8
Construction of Flood Control Structure along Jalaur River in Calinog, Iloilo
P00620245VS
Completed
Calinog, Iloilo
₱34M
₱34,299,712.0
9
Construction of Flood Control/Slope Protection along Alibunan River,Calinog, Iloilo
P00721999VS
Completed
Alibunan, Calinog, Iloilo
₱24M
₱24,499,987.0
10
Construction of Flood Control/Slope Protection along Jalaur River, Dingle, Iloilo
P00721934VS
Completed
Dumangas, Iloilo
₱24M
₱23,763,659.0
Projects by Type
Main Portal
17 projects
₱610M
Comments & Discussion
Loading comments...