Total Projects
23
Total Value
₱1.7B
₱1,701,743,641.6
Avg. Cost
₱74M
Avg. Progress
N/A
Project Status Distribution
Completed
23 projects
(100.0%)
Contract Value by Status
Completed
₱1.7B
₱1,701,743,641.6
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2024 | 1 |
₱140M ₱144,750,000.0 |
₱140M |
2023 | 6 |
₱440M ₱437,718,171.56 |
₱73M |
2022 | 16 |
₱1.1B ₱1,119,275,470.04 |
₱70M |
Projects by Region
Bicol Region
23 projects₱1.7B
₱1,701,743,641.6
Top 10 Provinces
1
16
Albay
₱1.2B
₱1,157,230,907.3
2
7
Camarines Sur
₱540M
₱544,512,734.3
Top 10 Projects by Contract Value
1
Construction of Quinale "A" River Flood Mitigation Structure (Polangui and Libon Section), Polangui, Albay
P00620296LZ
Completed
Polangui, Albay
₱190M
₱192,707,498.1
2
Construction of Flood Control Structure (Facing Downstream along River Dam Section) Zone 1, Barangay Sta. Cruz, Libon, Albay
P00823602LZ
Completed
Libon, Albay
₱140M
₱144,750,000.0
3
Construction of Pawili River Flood Mitigation Structure, Brgy. Causip and Brgy. Fabrica, Bula, Camarines Sur
P00620294LZ
Completed
Causip, Bula, Camarines Sur
₱97M
₱97,281,469.34
4
Construction of Barit River Flood Mitigation Structure (San Jose Section), Nabua, Camarines Sur
P00620275LZ
Completed
San Jose, Nabua, Camarines Sur
₱97M
₱97,244,668.14
5
Construction/Rehabilitation of Pawili River Flood Mitigation Structure, Brgy. San Jose and Brgy. Bagumbayan, Bula, Camarines Sur
P00620323LZ
Completed
San Jose, Bula, Camarines Sur
₱97M
₱97,103,902.58
6
Construction of Barit River Flood Mitigation Structure (Antipolo Young Section), Nabua, Camarines Sur
P00620274LZ
Completed
Antipolo Young, Nabua, Camarines Sur
₱93M
₱93,127,727.21
7
Rehabilitation of Left and Right Side of Talisay River Flood Mitigation Structure, Brgy. Zone 4, Libon, Albay
P00742201LZ
Completed
Libon, Albay
₱74M
₱74,249,999.5
8
Construction of Flood Control Structure, Right Side Facing Upstream of Double Barrel Box Culvert at Sitio Camlambay, Brgy. Bulusan, Libon, Albay
P00742202LZ
Completed
Bulusan, Libon, Albay
₱74M
₱74,179,689.03
9
Construction of Bacolod Flood Control Structure (Rightside facing Downstream of Bacolod Bridge) Bacolod, Libon, Albay
P00740466LZ
Completed
Bacolod, Libon, Albay
₱72M
₱72,373,483.6
10
Construction of Agos River Control Structure, barangay La Purisima, Polangui, Albay
P00740471LZ
Completed
La Purisima, Polangui, Albay
₱72M
₱72,305,000.0
Projects by Type