Back
Contractor Profile
JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS
Government Contractor Profile & Statistics
Total Projects
28
Total Value
₱1.4B
₱1,443,833,940.13
Avg. Cost
₱52M
Avg. Progress
N/A
Project Status Distribution
Completed
28 projects
(100.0%)
Contract Value by Status
Completed
₱1.4B
₱1,443,833,940.13
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2024 | 9 |
₱670M ₱672,390,534.98 |
₱75M |
| 2023 | 9 |
₱320M ₱316,269,607.07 |
₱35M |
| 2022 | 10 |
₱460M ₱455,173,798.08 |
₱46M |
Projects by Region
NCR
17 projects₱740M
₱740,491,264.04
Central Luzon
9 projects₱650M
₱645,443,446.09
CALABARZON
2 projects₱58M
₱57,899,230
Top 10 Provinces
1
8
Bulacan
₱550M
₱548,948,789.89
2
1
Tarlac
₱96M
₱96,494,656.2
3
2
Cavite
₱58M
₱57,899,230
Top 10 Projects by Contract Value
1
Construction of Riverbank Protection Structure at Barangay Catulinan, Baliuag, Bulacan
P00839475LZ
Completed
Catulinan, Baliuag, Bulacan
₱99M
₱98,999,220.54
2
Construction of Flood Control Structures along Bulo River Sta. 25+090 - Sta. 25+980, San Miguel Bulacan
P00639339LZ
Completed
San Jose, San Miguel, Bulacan
₱96M
₱96,495,644.65
3
Rehabilitation of Existing Dike along Parua River (Talimundoc-Marimla Section, Right Bank), Package A, Concepcion, Tarlac
P00838446LZ
Completed
Concepcion, Tarlac
₱96M
₱96,494,656.2
4
Construction of Retarding Basin at Estero de Maypajo (Phase IV), Tondo, Manila City
P00820068LZ
Completed
Barangay 160, City of Manila
₱96M
₱96,447,990.71
5
Construction of Flood Control Structure along Angat River, Sta. 12+340-Sta. 12+740, Angat, Bulacan
P00726522LZ
Completed
Banaban, Angat, Bulacan
₱87M
₱86,848,966.84
6
Construction of Flood Control Wall along the Banks of Creeks in Barangay 179, Caloocan City
P00820004LZ
Completed
City of Caloocan
₱85M
₱84,637,889.92
7
Construction of Reinforced Concrete Flood Control Structure, Barangay Cambaog (Sitio Teodoro to Purok 4), Bustos, Bulacan
P00843319LZ
Completed
Cambaog, Bustos, Bulacan
₱77M
₱77,199,050.27
8
Construction of Reinforced Concrete Flood Control Structure, Barangay Frances (Purok 4 to Purok 5), Calumpit, Bulacan
P00843321LZ
Completed
Frances, Calumpit, Bulacan
₱77M
₱77,187,426.47
9
Construction of Riverwall (Phase 2), Barangay Dampalit, Malabon City
P00632705LZ
Completed
Dampalit, City of Malabon
₱50M
₱49,500,000.0
10
Construction of Riverwall along Tanza Dike (Phase 2), Barangay Tanza 1, Navotas City
P00632706LZ
Completed
Tanza 1, City of Navotas
₱49M
₱49,497,745.13
Projects by Type
Main Portal
28 projects
₱1.4B
Comments & Discussion
Loading comments...