Construction of Flood Control Structure along Parua River, Right Side, Phase 1, San Antonio Section, Concepcion, Tarlac
Project Description
A downstream flood control structure is being built along the Parua River, Right Side, Phase 1, specifically in the San Antonio Section, Concepcion, Tarlac. This project is part of a broader flood mitigation initiative to protect low-lying communities and agricultural zones from seasonal flooding.
Location
San Antonio, Concepcion, Tarlac
Central Luzon
ZIP: 2316
15.325600, 120.659800
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...