Construction of Flood Control Structure along Parua River, Left Side, Phase 2, Lilibangan Section, Concepcion, Tarlac
Project Description
This project involves the construction of a flood control structure along the left bank of the Parua River, Phase 2, in Barangay Lilibangan, Concepcion, Tarlac. Spearheaded by the DPWH – Tarlac 2nd District Engineering Office, it aims to reinforce riverbanks, prevent overflow during heavy rains, and protect nearby agricultural and residential zones. The initiative includes revetment works, drainage improvements, and erosion control measures to enhance flood resilience in the area.
Location
Lilibangan, Concepcion, Tarlac
Central Luzon
ZIP: 2316
15.325800, 120.659200
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...