Construction of River Flood Control at Nalungtutan Bridge (San Dionisio II Section), Nagtipunan, Quirino
Project Description
A river flood control structure is being constructed at Nalungtutan Bridge (San Dionisio II Section) in Nagtipunan, Quirino to manage river flow and reduce flood risks.
Location
San Dionisio II, Nagtipunan, Quirino
Cagayan Valley
ZIP: 3404
16.342700, 121.672700
Project Cost
₱30M
₱30,000,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...