Construction of Flood Control Structure along Abra River, Phase I, Barangay Calaba, Bangued, Abra
Project Description
Phase I of the flood control structure along Abra River in Barangay Calaba, Bangued, Abra is being built to reduce flood risks and stabilize riverbanks.
Location
Calaba, Bangued, Abra
CAR
ZIP: 2800
17.600000, 120.616700
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...