Construction of Flood Control and Drainage Structure along Matuno River, Barat Section, Phase 2, Bambang, Nueva Vizcaya
Project Description
Phase 2 of the Matuno River structure continues the drainage and flood mitigation works in the Barat Section.
Location
Barat, Bambang, Nueva Vizcaya
Cagayan Valley
ZIP: 3702
17.270000, 121.970000
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...