Construction of Flood Control Structure along Namaltangan River, Namaltangan Bridge, Downstream, Barangay San Isidro, Dumalneg, Ilocos Norte
Project Description
A flood control structure is being constructed along Namaltangan River downstream of Namaltangan Bridge in Barangay San Isidro, Dumalneg, Ilocos Norte to manage river flow and reduce flood risks.
Location
San Isidro, Dumalneg, Ilocos Norte
Ilocos Region
ZIP: 2921
18.522000, 120.809600
Project Cost
₱5M
₱5,000,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...