Construction of Flood Control Structure along Abra River, Phase II, Barangay Bangbangar, Bangued, Abra
Project Description
Phase II of the flood control structure along Abra River in Barangay Bangbangar, Bangued, Abra is being constructed to extend flood protection measures.
Location
Bangbangar, Bangued, Abra
CAR
ZIP: 2800
17.600000, 120.616700
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...