Construction of Flood Control along Mananga River (Upstream), Left Side, Package 1, Sitio Proper, Barangay Camp IV, Talisay City, Cebu
Project Description
A flood control structure is being constructed along the upstream left side of Mananga River (Package 1) in Sitio Proper, Barangay Camp IV, Talisay City, Cebu to manage river overflow.
Location
Camp IV, City of Talisay, Cebu
Central Visayas
ZIP: 6045
10.266700, 123.833300
Project Cost
₱150M
₱150,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...