Construction of Balatukan River Flood Control Project at Brgy. Mandangoa, Balingasag, Misamis Oriental
Project Description
A flood control structure is being constructed along Balatukan River in Barangay Mandangoa, Balingasag, Misamis Oriental to prevent flooding in nearby coastal areas and riverbanks. The project includes hand-laid rock embankments, reinforced concrete works, and structural riprap to protect lives and property during heavy rainfall.
Location
Mandangoa, Balingasag, Misamis Oriental
Northern Mindanao
ZIP: 9005
8.742500, 124.783500
Project Cost
₱100M
₱100,000,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...