Construction of Flood Control Structure at Bogayo River, Kumalarang Br. 1 Section (B00549MN) along Pagadian City-Zamboanga City Rd (S01453MN), Package 2, Barangay Bogayo, Kumalarang, Zamboanga del Sur
Project Description
A downstream flood control structure is being built along Bogayo River in Barangay Bogayo, Kumalarang, Zamboanga del Sur to protect adjacent communities and infrastructure along the Pagadian City–Zamboanga City Road from seasonal flooding and riverbank erosion.
Location
Bogayo, Kumalarang, Zamboanga Del Sur
Zamboanga Peninsula
ZIP: 7015
7.683300, 123.283300
Project Cost
₱150M
₱147,842,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors