Construction of Flood Control Structure along Kipit River at Kipit Br. 2 Section (B01183MN) along Liloy-Siocon Rd (S01146MN) (Upstream - Left Side), Labason, Zamboanga del Norte
Project Description
This project involves the construction of a 802-meter flood control structure along the upstream left side of Kipit River at Kipit Bridge 2, along the Liloy-Siocon Road in Barangay Kipit, Labason, Zamboanga del Norte, to protect surrounding communities from flooding
Location
Kipit, Labason, Zamboanga Del Norte
Zamboanga Peninsula
ZIP: 7117
8.065735, 122.498486
Project Cost
₱150M
₱151,008,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...