Construction of Flood Control Structure along Kipit River at Kipit Br. 2 Section (B01183MN) along Liloy-Siocon Rd (S01146MN) (Downstream - Left Side), Labason, Zamboanga del Norte
Project Description
A flood control structure is being constructed along Kipit River at Kipit Bridge 2 Section along Liloy-Siocon Road (Downstream - Left Side) in Labason, Zamboanga del Norte to prevent erosion and flooding.
Location
Antonino (Pob.), Labason, Zamboanga Del Norte
Zamboanga Peninsula
ZIP: 7117
8.061813, 122.516487
Project Cost
₱150M
₱151,000,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project