Construction of Flood Control Structure and Drainage System along Bangon River, Phase 3, Barangay San Jose, Palo, Leyte
Project Description
A flood control structure and drainage system are being constructed along Bangon River in Barangay San Jose, Palo, Leyte (Phase 3) to reduce urban flooding.
Location
San Jose, Palo, Leyte
Eastern Visayas
ZIP: 6541
11.164299, 124.985600
Project Cost
₱250M
₱250,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...