Construction of Flood Mitigation Structure including Improvement of Waterway along Balaong River Control (Upstream Phase), Barangay Talbak, Doña Remedios Trinidad, Bulacan
Project Description
The Construction of Flood Mitigation Structure including Improvement of Waterway along Balaong River Control (Upstream Phase) in Barangay Talbak, Doña Remedios Trinidad, Bulacan is a major infrastructure project under the DPWH Flood Management Program
Location
Talbak, Doña Remedios Trinidad, Bulacan
Central Luzon
ZIP: 3009
15.019500, 121.095500
Project Cost
₱100M
₱100,000,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project