Construction of Flood Mitigation Structure including Improvement of Waterway along Maasim River Control (Downstream), Purok 1 Section, Barangay Bubulong Munti, San Ildefonso, Bulacan
Project Description
The Construction of Flood Mitigation Structure including Improvement of Waterway along Maasim River Control (Downstream), Purok 1 Section, Barangay Bubulong Munti, San Ildefonso, Bulacan is a major infrastructure project under the DPWH Flood Management Program
Location
Bubulong Munti, San Ildefonso, Bulacan
Central Luzon
ZIP: 3010
15.100500, 121.050000
Project Cost
₱100M
₱100,000,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...