Construction of Flood Mitigating Structure (Debris Control Barrier) along Mag-Asawang Tubig River, Oriental Mindoro
Project Description
A series of downstream flood control structures are being built along Mag-Asawang Tubig River in Naujan, Oriental Mindoro. These include a 20-meter river wall in Barangay Tigkan, a PHP19.79-million flood mitigation structure in Barangay Pinagsabangan II, and a 268.27-meter concrete revetment with steel sheet piles in Barangay San Carlos. The projects aim to protect flood-prone communities, farmlands, and infrastructure from seasonal inundation and climate-related hazards
Location
Tigkan, Naujan, Oriental Mindoro
MIMAROPA Region
ZIP: 5204
13.319700, 121.276400
Project Cost
₱200M
₱200,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...