Construction of Flood Protection Structure Phase 4 (Biñan-Carmona Boundary), Biñan Side, Biñan City, Laguna
Project Description
A downstream flood control structure is being built along Phase 4, near the Biñan-Carmona Boundary, specifically on the Biñan Side, in Biñan City, Laguna. This project is part of a multi-phase flood mitigation initiative to protect urban communities and improve drainage infrastructure in the boundary area between Laguna and Cavite
Location
San Antonio, City of Biñan, Laguna
CALABARZON
ZIP: 4024
14.312600, 121.045300
Project Cost
₱100M
₱100,000,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...