Construction of Flood Control Structure along Baras River, Phase 3, Baras, Rizal
Project Description
Phase 3 of the flood control structure is being constructed along Baras River in Baras, Rizal to extend flood protection.
Location
San Salvador, Baras, Rizal
CALABARZON
ZIP: 1970
14.521800, 121.265800
Project Cost
₱50M
₱50,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...