Construction of Flood Control Structure along Inerangan River (Segment 25), Ramos, Tarlac
Project Description
A downstream flood control structure is being built along the San Jose River, covering Sta. 08+320 to Sta. 08+620, specifically the Catmon Section in Santa Maria, Bulacan. This project is designed to enhance flood protection for residential and agricultural areas in the vicinity of Barangay Catmon.
Location
Pance, Ramos, Tarlac
Central Luzon
ZIP: 2311
15.658000, 120.619000
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project