Construction of Flood Control Structure along San Jose River, Sta. 08+620-Sta. 08+920 (Parada-San Vicente Section), Santa Maria, Bulacan
Project Description
A downstream flood control structure is being built along Caypombo River, Sta. 14+250–Sta. 14+650 (M. Sapa Section), Santa Maria, Bulacan. The project is designed to mitigate flooding in low-lying residential zones by reinforcing riverbanks and improving drainage flow.
Location
Catmon, Santa Maria, Bulacan
Central Luzon
ZIP: 3022
14.818500, 120.963000
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project