Construction of Flood Control Structure along Talisawa Bridge, Brgy. Talisawa, Datu Abdullah Sangki, Maguindanao del Sur
Project Description
Flood control infrastructure was constructed along Talisawa Bridge in Barangay Talisawa, Datu Abdullah Sangki, Maguindanao del Sur to mitigate flood hazards.
Location
Talisawa, Datu Abdullah Sangki, Maguindanao
BARMM
ZIP: 9617
6.753100, 124.491400
Project Cost
₱200M
₱200,000,000.0
Project Location Map
Location Map
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...