Construction of Flood Control Structure (Package B) at Purok 2, Barangay Malis, Guiguinto, Bulacan
Project Description
Package B of the flood control structure is being constructed at Purok 2, Barangay Malis, Guiguinto, Bulacan to manage stormwater and reduce flood risks.
Location
Malis, Guiguinto, Bulacan
Central Luzon
ZIP: 3015
14.833300, 120.883300
Project Cost
₱50M
₱50,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...