Construction of Flood Control Structure, San Miguel River, Brgy. Labne, San Miguel, Bulacan, (Package 13)
Project Description
A flood control structure is being built along San Miguel River in Barangay Labne, San Miguel, Bulacan (Package 13) to protect residential areas from flooding.
Location
Labne, San Miguel, Bulacan
Central Luzon
ZIP: 3011
15.147500, 120.961100
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...