Construction of Doroteo Flood Control Structure along Biliran Circumferential Road, Phase I, Almeria, Biliran
Project Description
Phase I of the Doroteo Flood Control Structure is being constructed along the Biliran Circumferential Road in Almeria, Biliran to manage river flow and prevent flooding.
Location
Talahid, Almeria, Biliran
Eastern Visayas
ZIP: 6544
11.583300, 124.400000
Project Cost
₱50M
₱50,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...