Construction of Flood Control Structure along San Jose River, Sta. 07+720 - Sta. 08+020 (Parada - San Vicente Section), Santa Maria, Bulacan
Project Description
This project involves the construction of a flood control structure along the San Jose River, covering Sta. 07+720 to Sta. 08+020 within the Parada–San Vicente Section of Santa Maria, Bulacan. Implemented by the DPWH – Bulacan 2nd District Engineering Office, it aims to reinforce riverbanks, prevent overflow during heavy rains, and protect nearby residential and agricultural zones. Works include revetment, drainage improvements, and erosion control measures to enhance flood resilience in the area.
Location
Parada, Santa Maria, Bulacan
Central Luzon
ZIP: 3022
14.823600, 120.956700
Project Cost
₱100M
₱100,000,000.0
Source of Fund
1 source
General Appropriations Act FY 2025
Implementing Agency
1 agency
Contractors
0 contractors
Project Updates
Updates
(0)
No updates yet
Be the first to share an update about this project
Project Updates
1 / 1
Use arrow keys to navigate • Press Esc to close
Loading comments...