WCIFWC

WBX CONSTRUCTION, INC (FORMERLY WBX CONSTRUCTION)

Government Contractor Profile & Statistics

Total Projects

12

Total Value

₱580M

₱578,483,232.28

Avg. Cost

₱48M

Avg. Progress

N/A

Project Status Distribution

Completed
12 projects (100.0%)

Contract Value by Status

Completed

₱580M

₱578,483,232.28

Yearly Statistics

Year Projects Total Value Average Cost
2024 3

₱130M

₱132,932,399.62

₱44M
2023 4

₱330M

₱327,755,044.84

₱82M
2022 5

₱120M

₱117,795,787.82

₱24M

Projects by Region

Bicol Region

4 projects

₱350M

₱353,970,215.01

Central Luzon

7 projects

₱210M

₱212,955,310.06

NCR

1 project

₱12M

₱11,557,707.21

Top 10 Provinces

1

Bulacan

7

₱210M

₱212,955,310.06

2

Sorsogon

2

₱210M

₱208,584,567.8

3

Camarines Sur

1

₱96M

₱96,386,086.27

4

Albay

1

₱49M

₱48,999,560.94

Top 10 Projects by Contract Value

1

Construction of Flood Control Structure, Brgy. Sto. Domingo, Irosin, Sorsogon

P00740450LZ Completed Irosin, Sorsogon

₱110M

₱106,149,680.2

2

Construction of Flood Control Structure, Brgy. San Isidro, Bulan, Sorsogon

P00740449LZ Completed San Isidro, Bulan, Sorsogon

₱100M

₱102,434,887.6

3

Construction of Bank Protection Structure along Bicol River, Ombao Polpog Section, Bula, Camarines Sur

P00736116LZ Completed Ombao Polpog, Bula, Camarines Sur

₱96M

₱96,386,086.27

4

Construction of Reinforced Concrete Flood Control Structure, Barangay Matungao, Bulakan, Bulacan

P00843322LZ Completed Matungao, Bulacan, Bulacan

₱72M

₱72,374,967.11

5

Construction of River Protection Structure and Rehabilitation of Waterway along Angat River, K010+793 to K010+943, Barangay Cambaog, Bustos, Bulacan

P00821577LZ Completed Cambaog, Bustos, Bulacan

₱49M

₱48,999,725.3

6

Construction of River Bank Protection Works and Drainage System along Brgy. Taysan River Legazpi City

P00639543LZ Completed City of Legazpi, Albay

₱49M

₱48,999,560.94

7

Construction of Flood Control Structures along Balagtas River Sta. 00+760 to Sta. 00+960 Brgy. Dalig, Balagtas, Bulacan

P00621532LZ Completed Dalig, Balagtas, Bulacan

₱24M

₱24,498,166.71

8

Construction of Slope Protection (Revetment), Barangay Cambaog, Bustos, Bulacan

P00726150LZ Completed Cambaog, Bustos, Bulacan

₱23M

₱22,784,390.77

9

Construction of Drainage Canal along Barangays Subic, Tibag and Sabang, Baliuag, Bulacan

P00632811LZ Completed Subic, Baliuag, Bulacan

₱20M

₱19,799,997.15

10

CONSTRUCTION OF DRAINAGE CANAL, BARANGAY BUNDUCAN, BOCAUE, BULACAN

22CC0046 Completed Bocaue, Bulacan

₱15M

₱14,698,701.91

Projects by Type

Main Portal

12 projects

₱580M

Comments & Discussion

Loading comments...

Data Source

Powered by official government infrastructure monitoring data

Project DIME

Digital Imaging for Monitoring and Evaluation

A digital transformation initiative by the Department of Budget and Management (DBM) in partnership with the Philippine Open Government Partnership, relaunched in 2023 to enable participatory and real-time monitoring of government infrastructure projects.

How It Works

Advanced Monitoring: Uses satellites, drones, and geotagging technologies to track high-value infrastructure projects nationwide

Citizen Participation: Empowers Filipinos to monitor project progress and provide feedback on actual project status

Enhanced Transparency: Ensures public funds are used effectively through open data and real-time project monitoring

Mission

Provide an efficient mechanism for monitoring and evaluation of government programs through innovative use of technologies

Vision

Integrate science-based monitoring and evaluation principles into the government's budget and management system

"Project DIME is a game-changer—ensuring greater efficiency, transparency, and public participation in the way services are delivered to the Filipino people."

Secretary Amenah F. Pangandaman

DBM Secretary

Learn more about Project DIME
Visit Official Site