Back
Contractor Profile
VEN RAY CONSTRUCTION CORPORATION
Government Contractor Profile & Statistics
Total Projects
39
Total Value
₱2.2B
₱2,248,326,622.93
Avg. Cost
₱58M
Avg. Progress
N/A
Project Status Distribution
Completed
39 projects
(100.0%)
Contract Value by Status
Completed
₱2.2B
₱2,248,326,622.93
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2024 | 11 |
₱560M ₱559,583,382.2 |
₱51M |
2023 | 10 |
₱380M ₱380,539,506.1 |
₱38M |
2022 | 16 |
₱1.2B ₱1,207,479,958.1 |
₱75M |
2021 | 2 |
₱100M ₱100,723,776.53 |
₱50M |
Projects by Region
Northern Mindanao
18 projects₱1.2B
₱1,215,128,776.35
Central Visayas
21 projects₱1B
₱1,033,197,846.58
Top 10 Provinces
1
21
Cebu
₱1B
₱1,033,197,846.58
2
10
Misamis Oriental
₱830M
₱830,268,821.35
3
8
Bukidnon
₱380M
₱384,859,955
Top 10 Projects by Contract Value
1
Construction of Flood Control Structure along Alubijid River Downstream of Alubijid Bridge (Right Side), Package 1, Alubijid, Misamis Oriental
P00620344MN
Completed
Poblacion, Alubijid, Misamis Oriental
₱140M
₱141,124,491.5
2
Construction of Flood Control Structure along Alubijid River Downstream of Alubijid Bridge (Left Side), Package 2, Alubijid, Misamis Oriental
P00620345MN
Completed
Poblacion, Alubijid, Misamis Oriental
₱140M
₱139,728,160.1
3
Rehabilitation of Flood Control Structure, Bitan-Ag Creek, Package 12, Sta. 0+000.00 - Sta. 0+226.00, Downstream Section, Cagayan de Oro City
P00620048MN
Completed
City of Cagayan De Oro, Misamis Oriental
₱110M
₱114,013,627.6
4
Rehabilitation of Flood Control Structure, Bitan-Ag Creek, Package 13, Sta. 0+226.00 - Sta. 0+456.70, Cagayan de Oro City
P00620049MN
Completed
City of Cagayan De Oro, Misamis Oriental
₱110M
₱114,009,217.0
5
Rehabilitation of Bitan-Ag Creek (Upstream Section), Incl. Channelization, Package 18, Sta. 0+668.30 - Sta. 0+868.400, Cagayan de Oro City
P00620046MN
Completed
City of Cagayan De Oro, Misamis Oriental
₱97M
₱97,194,243.34
6
Construction of Flood Mitigation Structure along Cagayan de Oro City-Dominorog-Camp Kibaritan Rd, (Upstream and Downstream) of Pigcutin Bridge, Talakag, Bukidnon
P00820028MN
Completed
Talakag, Bukidnon
₱97M
₱96,500,000.0
7
Construction of Flood Control Structure along CDO City Dominorog Camp Kibaritan Rd (Upstream and Downstream of Tal-uban Bridge), Phase 2, Talakag, Bukidnon
P00620031MN
Completed
Basak, Talakag, Bukidnon
₱97M
₱96,500,000.0
8
Construction of Flood Mitigation Structure at Guinabasan River, Barangay Sta. Lucia - Barangay Bago, Asturias, Cebu
P00820346VS
Completed
Asturias, Cebu
₱96M
₱96,341,651.25
9
Construction of Slope Protection Structure along Carcar-Barili Road, Sta. 56+000-Sta.57+000, Barili, Cebu
P00630192VS
Completed
Barili, Cebu
₱96M
₱96,277,080.22
10
Construction of Flood Mitigation Structure along Sapangdaku River, Toledo City, Cebu
P00820343VS
Completed
City of Toledo, Cebu
₱77M
₱77,200,000.0
Projects by Type
Main Portal
39 projects
₱2.2B
Comments & Discussion
Loading comments...