Total Projects
30
Total Value
₱2.7B
₱2,682,657,705.82
Avg. Cost
₱89M
Avg. Progress
N/A
Project Status Distribution
Completed
22 projects
(73.3%)
Ongoing
8 projects
(26.7%)
Contract Value by Status
Completed
₱2.3B
₱2,255,689,571.61
Ongoing
₱430M
₱426,968,134.21
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2025 | 8 |
₱430M ₱426,968,134.21 |
₱53M |
2024 | 6 |
₱950M ₱954,592,008.02 |
₱160M |
2023 | 4 |
₱280M ₱276,794,689.9 |
₱69M |
2022 | 12 |
₱1B ₱1,024,302,873.69 |
₱85M |
Projects by Region
Caraga
19 projects₱1.9B
₱1,903,563,718.3
Northern Mindanao
11 projects₱780M
₱779,093,987.52
Top 10 Provinces
1
18
Agusan Del Norte
₱1.9B
₱1,864,124,936.9299998
2
11
Misamis Oriental
₱780M
₱779,093,987.52
3
1
Agusan Del Sur
₱39M
₱39,438,781.37
Top 10 Projects by Contract Value
1
Construction of Flood Control Structure - Lower Agusan Development Project, Flood Control (Bancasi Bridge Revetment Upstream and Downstream), Package 2, Butuan City, Agusan del Norte
P00835820MN
Completed
Bancasi, City of Butuan, Agusan Del Norte
₱190M
₱192,999,989.2
2
Construction of Flood Control Structure Along Cabadbaran River Upstream, Package 3, Cabadbaran City, Agusan del Norte
P00835844MN
Completed
Mahaba, City of Cabadbaran, Agusan Del Norte
₱190M
₱192,999,918.7
3
Rehabilitation of Flood Control Structure along Malalag - Libertad Section, Package 2, Butuan City, Agusan del Norte
P00835857MN
Completed
Libertad, City of Butuan, Agusan Del Norte
₱190M
₱192,999,520.5
4
Rehabilitation of Flood Control Structure along Malalag - Libertad Section, Package 1, Butuan City, Agusan del Norte
P00835856MN
Completed
Libertad, City of Butuan, Agusan Del Norte
₱190M
₱192,998,943.6
5
Construction of Main Drainage Canal along Jct. Montilla Boulevard - Salvador Calo Street to LADP Main Drainage Canal, Butuan City, Agusan del Norte
P00630549MN
Completed
City of Butuan, Agusan Del Norte
₱150M
₱154,399,819.6
6
Construction of Flood Control Structure along Naawan River Downstream of Naawan Bridge (Left Side), Package 2, Naawan, Misamis Oriental
P00632313MN
Completed
Poblacion, Naawan, Misamis Oriental
₱140M
₱137,503,763.4
7
Construction of Flood Control Structures along Cabadbaran River Downstream, Package 1, Cabadbaran, Agusan del Norte
P00630540MN
Completed
City of Cabadbaran, Agusan Del Norte
₱120M
₱115,799,995.1
8
REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, BUENAVISTA-BUNAGUIT RD - K1273 + 185 - K1273 + 298
310109101692000
Ongoing
Buenavista, Agusan Del Norte
₱110M
₱108,375,848.73
9
Construction of Flood Control Structure Along Lake Mainit- Tubay River (Kalinawan-Karak-an Section), Sta. 2+422.75 - Sta. 2+788.00, Package 2, Tubay, Agusan del Norte
P00620102MN
Completed
Tubay, Agusan Del Norte
₱110M
₱106,149,980.6
10
Construction of Riverdike along Lingayao Bridge, Las Nieves, Agusan del Norte
P00721346MN
Completed
Lingayao, Las Nieves, Agusan Del Norte
₱96M
₱96,499,990.36
Projects by Type
Main Portal
30 projects
₱2.7B