Back
Contractor Profile
SISBRO CONSTRUCTION CORPORATION (FORMERLY: SISBRO CONSTRUCTION & SUPPLY)
Government Contractor Profile & Statistics
Total Projects
10
Total Value
₱820M
₱820,164,845.92
Avg. Cost
₱82M
Avg. Progress
N/A
Project Status Distribution
Completed
10 projects
(100.0%)
Contract Value by Status
Completed
₱820M
₱820,164,845.92
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2024 | 8 |
₱770M ₱772,149,961.98 |
₱97M |
2023 | 1 |
₱24M ₱23,516,730.44 |
₱24M |
2022 | 1 |
₱24M ₱24,498,153.5 |
₱24M |
Projects by Region
Bicol Region
7 projects₱530M
₱530,664,845.92
Northern Mindanao
3 projects₱290M
₱289,500,000
Top 10 Provinces
1
3
Misamis Oriental
₱290M
₱289,500,000
2
2
Camarines Sur
₱280M
₱279,850,000
3
4
Albay
₱230M
₱227,298,115.48000002
4
1
Masbate
₱24M
₱23,516,730.44
Top 10 Projects by Contract Value
1
Construction of Bank Protection Structure along Barit River, Santa Justina Section, Barangay San Justina, Buhi, Camarines Sur
P00820425LZ
Completed
Buhi, Camarines Sur
₱140M
₱139,925,000.0
2
Construction of Flood Control Structure along Barit River, Salvacion Section, Barangay Salvacion, Buhi, Camarines Sur
P00820437LZ
Completed
Salvacion, Buhi, Camarines Sur
₱140M
₱139,925,000.0
3
Construction of Flood Control Structure along Left Bank of Pugaan River, Downstream of Sta. Ana Bridge, Tagoloan, Misamis Oriental
P00820266MN
Completed
Tagoloan, Misamis Oriental
₱97M
₱96,500,000.0
4
Construction of Flood Mitigation Structure along San Antonio River (Upstream of San Antonio Bridge), Package 1, Jasaan, Misamis Oriental
P00820285MN
Completed
San Antonio, Jasaan, Misamis Oriental
₱97M
₱96,500,000.0
5
Construction of Flood Mitigation Structure along San Antonio River (Upstream of San Antonio Bridge), Package 2, Jasaan, Misamis Oriental
P00820286MN
Completed
San Antonio, Jasaan, Misamis Oriental
₱97M
₱96,500,000.0
6
Construction of Basag River Control Structure, Upstream of Spillway, Barangay Basag, Ligao City, Albay
P00823591LZ
Completed
Basag, City of Ligao, Albay
₱97M
₱96,500,000.0
7
Construction of Ugsong River Flood Control Structure (Left and Right Side), Phase 2, Ligao City, Albay
P00823622LZ
Completed
City of Ligao, Albay
₱96M
₱96,499,961.98
8
Rehabilitation of Quirangay River Wall, Camalig, Albay
P00631348LZ
Completed
Quirangay, Camalig, Albay
₱24M
₱24,498,153.5
9
Construction of Flood Mitigation Structure at Siargao River(Upstream), Poblacion District 2, Claveria, Masbate
P00726297LZ
Completed
Claveria, Masbate
₱24M
₱23,516,730.44
10
Construction of San Agustin CIS Slope Protection Works at Auxiliary Dam, Libon, Albay
P00821003LZ
Completed
San Agustin, Libon, Albay
₱9.8M
₱9,800,000.0
Projects by Type
Main Portal
10 projects
₱820M
Comments & Discussion
Loading comments...