R.R. RICAFORT CONSTRUCTION AND SUPPLIES
Government Contractor Profile & Statistics
Total Projects
23
Total Value
₱1.4B
₱1,380,205,375.22
Avg. Cost
₱60M
Avg. Progress
N/A
Project Status Distribution
Completed
23 projects
(100.0%)
Contract Value by Status
Completed
₱1.4B
₱1,380,205,375.22
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2024 | 2 |
₱170M ₱174,147,276.44 |
₱87M |
| 2023 | 10 |
₱730M ₱732,561,908.24 |
₱73M |
| 2022 | 11 |
₱470M ₱473,496,190.54 |
₱43M |
Projects by Region
Central Luzon
23 projects₱1.4B
₱1,380,205,375.22
Top 10 Provinces
1
23
Tarlac
₱1.4B
₱1,380,205,375.22
Top 10 Projects by Contract Value
1
Construction of Paniqui Drainage System, Paniqui, Tarlac
P00823477LZ
Completed
Paniqui, Tarlac
₱140M
₱144,750,000.0
2
Rehabilitation of Slope Protection Structure with Steel Sheet Pile Foundation along Tarlac Flood Control (Right Dike), Carangian Section (Package P), Tarlac City, Tarlac
P00727290LZ
Completed
Carangian, City of Tarlac, Tarlac
₱96M
₱95,733,748.94
3
Construction of Slope Protection Structure with Steel Sheet Pile Foundation along Tarlac Flood Control (Left Dike), Sta. Maria-San Bartolome Section (Package E), Tarlac
P00740361LZ
Completed
Santa Maria, City of Tarlac, Tarlac
₱96M
₱95,530,140.96
4
Construction of Slope Protection with Steel Sheet Pile Foundation along Moriones River, Tibagan Section Package F, Tibagan, Tarlac City, Tarlac
P00727289LZ
Completed
Tibag, City of Tarlac, Tarlac
₱96M
₱95,524,711.75
5
Construction of Slope Protection Structure with Steel Sheet Pile Foundation along San Isidro Creek (Package N), Tarlac City, Tarlac
P00727288LZ
Completed
San Isidro, City of Tarlac, Tarlac
₱96M
₱95,504,333.97
6
Construction of Flood Control Structure with Steel Sheet Pile Foundation along Ungot Creek (Package Q), Tarlac City, Tarlac
P00727285LZ
Completed
Ungot, City of Tarlac, Tarlac
₱95M
₱95,495,483.68
7
Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, San Jose-San Bartolome Section (Package E), Gerona, Tarlac
P00726541LZ
Completed
San Jose, Gerona, Tarlac
₱70M
₱70,203,784.94
8
Construction of Slope Protection with Steel Sheet Pile Foundation Along Batacan River, Pit-ao Section (Package C), Barangay Pit-ao, San Clemente, Tarlac
P00735973LZ
Completed
Pit-ao, San Clemente, Tarlac
₱70M
₱70,203,757.24
9
Rehabilitation of Existing Dike along Lucung River, Sta. 4+859 to Sta. 4+314, D/S of Santiago Bridge (Jefmin Section, Left Bank), Concepcion, Tarlac
P00620196LZ
Completed
Santiago, Concepcion, Tarlac
₱58M
₱57,899,409.79
10
Construction of Flood Mitigation Structure along Camiling River, Right Bank, Sawat Section (Package D), Sawat, Camiling, Tarlac
P00621092LZ
Completed
Sawat, Camiling, Tarlac
₱48M
₱48,019,463.48
Projects by Type
Main Portal
23 projects
₱1.4B