Contractor Profile
RJR CALCON CORP.
Government Contractor Profile & Statistics
Total Projects
9
Total Value
₱510M
₱510,275,581.01
Avg. Cost
₱57M
Avg. Progress
N/A
Project Status Distribution
Completed
7 projects
(77.8%)
Ongoing
2 projects
(22.2%)
Contract Value by Status
Ongoing
₱340M
₱338,553,423.2
Completed
₱170M
₱171,722,157.81
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2024 | 6 |
₱400M ₱400,515,719.44 |
₱67M |
2022 | 2 |
₱34M ₱34,349,374.87 |
₱17M |
2021 | 1 |
₱75M ₱75,410,486.7 |
₱75M |
Projects by Region
Zamboanga Peninsula
3 projects₱410M
₱413,963,909.9
Central Luzon
1 project₱30M
₱29,699,463.05
Central Visayas
1 project₱29M
₱29,399,951.87
BARMM
2 projects₱27M
₱27,312,833.27
Davao Region
1 project₱4.9M
₱4,949,999.92
Western Visayas
1 project₱4.9M
₱4,949,423
Top 10 Provinces
1
3
Zamboanga Del Sur
₱410M
₱413,963,909.9
2
1
Bulacan
₱30M
₱29,699,463.05
3
1
Cebu
₱29M
₱29,399,951.87
4
2
Basilan
₱27M
₱27,312,833.27
5
1
Davao Del Norte
₱4.9M
₱4,949,999.92
6
1
Capiz
₱4.9M
₱4,949,423
Top 10 Projects by Contract Value
1
PREVENTIVE MAINTENANCE - SECONDARY ROADS - ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD
24J00004
Ongoing
City of Zamboanga, Zamboanga Del Sur
₱180M
₱180,061,220.2
2
ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD - K1945+000.00 - K1945+420.00; K1965+000.00 - K1968+000.00; K1971+000.00 - K1972+052.88
24J00003
Ongoing
City of Zamboanga, Zamboanga Del Sur
₱160M
₱158,492,203.0
3
Construction of Flood Control Structure at Latap River, Zamboanga City
P00522041MN
Completed
City of Zamboanga, Zamboanga Del Sur
₱75M
₱75,410,486.7
4
Construction of Waterways and Flood Control Structure along Guiguinto River, Brgy. Malis, Guiguinto, Bulacan
P00845983LZ
Completed
Malis, Guiguinto, Bulacan
₱30M
₱29,699,463.05
5
Construction of of Seawall Protection Works along Santander-Barili-Toledo Rd at Brgy. Poblacion, Sta. 0 + 000 - Sta. 0 + 167.00, Moalboal, Cebu
P00620451VS
Completed
Moalboal, Cebu
₱29M
₱29,399,951.87
6
ASPHALT OVERLAY - BASILAN CIRCUMFERENTIAL RD - K0002 + 146 - K0002 + 922
24JH0001
Completed
Tabuan-Lasa, Basilan
₱23M
₱23,029,453.18
7
Construction of Drainage, Prk. Liwayway 2nd Avenue,Magugpo South,Tagum Davao del Norte
P00836189MN
Completed
Magugpo South, City of Tagum, Davao Del Norte
₱4.9M
₱4,949,999.92
8
Construction of Drainage System, Barangay Dayao, Roxas City, Capiz
P00633215VS
Completed
President Roxas, Capiz
₱4.9M
₱4,949,423.0
9
ASPHALT OVERLAY - BASILAN CIRCUMFERENTIAL RD - K0001 + 706 - K0002 + 000
24JH0002
Completed
Tabuan-Lasa, Basilan
₱4.3M
₱4,283,380.09
Projects by Type
Main Portal
9 projects
₱510M