Back
Contractor Profile
RAM BUILDERS
Government Contractor Profile & Statistics
Total Projects
26
Total Value
₱680M
₱681,873,039.29
Avg. Cost
₱26M
Avg. Progress
N/A
Project Status Distribution
Completed
26 projects
(100.0%)
Contract Value by Status
Completed
₱680M
₱681,873,039.29
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2024 | 7 |
₱79M ₱78,500,292.81 |
₱11M |
| 2023 | 13 |
₱480M ₱484,221,282.02 |
₱37M |
| 2022 | 6 |
₱120M ₱119,151,464.46 |
₱20M |
Projects by Region
SOCCSKSARGEN
8 projects₱300M
₱298,010,643.93
CALABARZON
12 projects₱160M
₱160,861,029.42
Eastern Visayas
3 projects₱140M
₱143,989,890
Davao Region
1 project₱68M
₱67,550,000
Caraga
1 project₱6.9M
₱6,855,886.45
CAR
1 project₱4.6M
₱4,605,589.49
Top 10 Provinces
1
6
South Cotabato
₱170M
₱171,325,898.72
2
10
Quezon
₱150M
₱151,503,093.81
3
3
Leyte
₱140M
₱143,989,890
4
2
Sarangani
₱130M
₱126,684,745.21
5
1
Davao Del Sur
₱68M
₱67,550,000
6
2
Cavite
₱9.4M
₱9,357,935.61
7
1
Surigao Del Norte
₱6.9M
₱6,855,886.45
8
1
Kalinga
₱4.6M
₱4,605,589.49
Top 10 Projects by Contract Value
1
Construction of Flood Control Structure at Sitio Buenavista, Barangay Pag- Asa, Alabel, Sarangani
P00721303MN
Completed
Pag-Asa, Alabel, Sarangani
₱77M
₱77,186,230.46
2
Construction of Concrete Revetment along Padada-Mainit River (Protecting Padada - Kiblawan-Malungon -By Pass Road), Sulop, Davao del Sur
P00644824MN
Completed
Sulop, Davao Del Sur
₱68M
₱67,550,000.0
3
Construction of Drainage System, Maasim Integrated Transport Terminal Complex, Maasim, Sarangani
P00734407MN
Completed
Poblacion, Maasim, Sarangani
₱49M
₱49,498,514.75
4
Construction of Shoreline/Seawall in Barangay V, Quezon, Quezon
P00640562LZ
Completed
Quezon, Quezon
₱49M
₱49,000,000.0
5
Construction/Rehabilitation of Flood Control Mitigation Facilities along San Isidro River Downstream, Brgy. San Isidro, Sta. Fe, Leyte
P00721962VS
Completed
San Isidro, Santa Fe, Leyte
₱48M
₱48,000,823.0
6
Construction/Rehabilitation of Flood Control Mitigation Facilities along Lingayon River (Lingayon Bridge), Downstream, Brgy. Lingayon, Alangalang, Leyte
P00721963VS
Completed
Lingayon, Alangalang, Leyte
₱48M
₱48,000,157.0
7
Construction/Rehabilitation of Flood Control Mitigation Facilities along San Isidro River Upstream, Brgy., San Isidro, Sta. Fe, Leyte
P00721964VS
Completed
San Isidro, Santa Fe, Leyte
₱48M
₱47,988,910.0
8
Construction of Bank Protection Structure along Bolok Creek, Koronadal City, South Cotabato
P00732163MN
Completed
Morales, City of Koronadal, South Cotabato
₱34M
₱34,299,901.86
9
Construction of River Bank Protection along Banga River, Barangay Dumaguil, Norala, South Cotabato
P00820353MN
Completed
Dumaguil, Norala, South Cotabato
₱30M
₱29,785,008.72
10
Construction of Flood Control Structure along Silway River, Barangay Simbo, Tupi, South Cotabato
P00522255MN
Completed
Simbo, Tupi, South Cotabato
₱29M
₱29,398,635.49
Projects by Type
Main Portal
26 projects
₱680M
Comments & Discussion
Loading comments...