Back
Contractor Profile
N.M.E. CONSTRUCTION
Government Contractor Profile & Statistics
Total Projects
15
Total Value
₱440M
₱437,646,510.8
Avg. Cost
₱29M
Avg. Progress
N/A
Project Status Distribution
Completed
14 projects
(93.3%)
Incomplete
1 projects
(6.7%)
Contract Value by Status
Completed
₱410M
₱408,246,798.36
Incomplete
₱29M
₱29,399,712.44
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2025 | 1 |
₱9.8M ₱9,793,000.0 |
₱9.8M |
2024 | 6 |
₱170M ₱171,394,605.57 |
₱29M |
2023 | 6 |
₱180M ₱180,736,703.71 |
₱30M |
2022 | 2 |
₱76M ₱75,722,201.52 |
₱38M |
Projects by Region
NCR
5 projects₱230M
₱225,310,110.81
Central Luzon
4 projects₱140M
₱135,825,397.8
CAR
1 project₱29M
₱29,352,752.8
Central Visayas
3 projects₱23M
₱22,750,898.81
Cagayan Valley
1 project₱20M
₱19,600,000
Bicol Region
1 project₱4.8M
₱4,807,350.58
Top 10 Provinces
1
3
Bulacan
₱87M
₱86,845,532.42
2
1
Pampanga
₱49M
₱48,979,865.38
3
1
Benguet
₱29M
₱29,352,752.8
4
1
Nueva Vizcaya
₱20M
₱19,600,000
5
2
Bohol
₱15M
₱14,683,000
6
1
Cebu
₱8.1M
₱8,067,898.81
7
1
Catanduanes
₱4.8M
₱4,807,350.58
Top 10 Projects by Contract Value
1
Construction of Drainage System (Box Culvert) Labores St. and Vicinity (Phase II), Manila City
P00725509LZ
Completed
City of Manila
₱58M
₱57,660,100.17
2
Drainage Improvement along Remedios St. from Remedios Circle to Singalong St., Malate, Manila Phase III
P00620068LZ
Completed
Barangay 719, City of Manila
₱51M
₱51,225,094.97
3
Construction Slope Protection along Abacan River, Barangay Anunas to Barangay Malabañas, Angeles City
P00820849LZ
Completed
Anunas, City of Angeles, Pampanga
₱49M
₱48,979,865.38
4
Construction of Drainage System (Box Culvert) Medel St. and Vicinity, Manila City
P00726034LZ
Completed
City of Manila
₱48M
₱47,852,928.28
5
Construction of Flood Control Structure Meycauayan Tributaries (Left Side), NLEX-Langka-Libtong Section, Meycauayan, Bulacan
P00726502LZ
Completed
Libtong, City of Meycauayan, Bulacan
₱40M
₱39,564,412.44
6
Construction of Drainage System Tejeron St., (Phase II) Syquia St. to Zobel Roxas, Sta. Ana, Manila
P00820658LZ
Completed
Barangay 819, City of Manila
₱39M
₱39,172,274.95
7
Construction of Drainage System (Box Culvert) Jesus St. Ext. (Sta. 0+000 to Sta. 0+255), Pandacan, Manila
P00820654LZ
Incomplete
City of Manila
₱29M
₱29,399,712.44
8
Construction of Flood Mitigation Structure along Agno River, Pusong Section, Sta. 0+000 - Sta. 0+360 (B.S), Buguias, Benguet
P00821532LZ
Completed
Buguias, Benguet
₱29M
₱29,352,752.8
9
Construction of Flood Control Structures along Guiguinto River Sta. 01+840 to Sta. 02+040 Malis Section, Guiguinto, Bulacan
P00621531LZ
Completed
Malis, Guiguinto, Bulacan
₱24M
₱24,497,106.55
10
Construction of Flood Control Structure along Angat River at Banga 2nd Section, Plaridel, Bulacan
P00726724LZ
Completed
Banga II, Plaridel, Bulacan
₱23M
₱22,784,013.43
Projects by Type
Main Portal
15 projects
₱440M
Comments & Discussion
Loading comments...