MRCIFMR

M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS

Government Contractor Profile & Statistics

Total Projects

14

Total Value

₱960M

₱960,552,122.5

Avg. Cost

₱69M

Avg. Progress

N/A

Project Status Distribution

Completed
14 projects (100.0%)

Contract Value by Status

Completed

₱960M

₱960,552,122.5

Yearly Statistics

Year Projects Total Value Average Cost
2024 3

₱240M

₱241,998,638.58

₱81M
2023 7

₱550M

₱545,036,172.62

₱78M
2022 4

₱170M

₱173,517,311.3

₱43M

Projects by Region

Central Luzon

11 projects

₱830M

₱831,894,335.32

NCR

2 projects

₱92M

₱92,119,992.18

CALABARZON

1 project

₱37M

₱36,537,795

Top 10 Provinces

1

Bulacan

11

₱830M

₱831,894,335.32

2

Cavite

1

₱37M

₱36,537,795

Top 10 Projects by Contract Value

1

Construction of Revetment Wall at Barangay Tangos, Sta. 01+120 to Sta. 01+520, Baliuag, Bulacan

P00725684LZ Completed Tangos, Baliuag, Bulacan

₱96M

₱96,499,915.59

2

Construction of Revetment Wall at Barangay Hinukay, Sta. 02+780 to Sta. 03+180, Baliuag, Bulacan

P00725685LZ Completed Hinukay, Baliuag, Bulacan

₱96M

₱96,499,701.59

3

Construction of Revetment Wall at Barangay Piel, Sta. 01+820 to Sta. 02+220, Baliuag, Bulacan

P00725683LZ Completed Piel, Baliuag, Bulacan

₱96M

₱96,499,443.56

4

Construction of Riverbank Protection Structure at Barangay Bagbaguin, Pandi, Bulacan

P00838387LZ Completed Bagbaguin, Pandi, Bulacan

₱96M

₱96,499,404.34

5

Construction of Riverbank Protection Structure along Guiguinto River, Barangay Daungan, Guiguinto, Bulacan

P00838383LZ Completed Daungan, Guiguinto, Bulacan

₱96M

₱96,499,234.24

6

Construction of Flood Control Project and Rehabilitation of Waterways along Bocaue River Brgy. Bambang Bocaue, Bulacan

P00742328LZ Completed Bambang, Bocaue, Bulacan

₱74M

₱74,249,977.42

7

Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan (K003+220 to K003+420)

P00740348LZ Completed Pritil, Guiguinto, Bulacan

₱72M

₱72,374,703.78

8

Construction of Flood Control Structure along Balagtas River, Panginay (LS), Balagtas, Bulacan (K014+770 to K014+920)

P00740352LZ Completed Panginay, Balagtas, Bulacan

₱72M

₱72,374,635.68

9

Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 3), Barangay Muzon, Malabon City

P00820545LZ Completed Muzon, City of Malabon

₱49M

₱49,000,000.0

10

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MALIBONG BATA SECTION, PANDI, BULACAN

22CC0094 Completed Pandi, Bulacan

₱44M

₱44,076,500.35

Projects by Type

Main Portal

14 projects

₱960M

Comments & Discussion

Loading comments...

Data Source

Powered by official government infrastructure monitoring data

Project DIME

Digital Imaging for Monitoring and Evaluation

A digital transformation initiative by the Department of Budget and Management (DBM) in partnership with the Philippine Open Government Partnership, relaunched in 2023 to enable participatory and real-time monitoring of government infrastructure projects.

How It Works

Advanced Monitoring: Uses satellites, drones, and geotagging technologies to track high-value infrastructure projects nationwide

Citizen Participation: Empowers Filipinos to monitor project progress and provide feedback on actual project status

Enhanced Transparency: Ensures public funds are used effectively through open data and real-time project monitoring

Mission

Provide an efficient mechanism for monitoring and evaluation of government programs through innovative use of technologies

Vision

Integrate science-based monitoring and evaluation principles into the government's budget and management system

"Project DIME is a game-changer—ensuring greater efficiency, transparency, and public participation in the way services are delivered to the Filipino people."

Secretary Amenah F. Pangandaman

DBM Secretary

Learn more about Project DIME
Visit Official Site