Back
Contractor Profile
LONG ISLAND BUILDERS & CONSTRUCTION
Government Contractor Profile & Statistics
Total Projects
15
Total Value
₱960M
₱963,825,023.17
Avg. Cost
₱64M
Avg. Progress
N/A
Project Status Distribution
Completed
12 projects
(80.0%)
Ongoing
3 projects
(20.0%)
Contract Value by Status
Completed
₱630M
₱634,411,669.61
Ongoing
₱330M
₱329,413,353.56
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2024 | 7 |
₱600M ₱604,341,049.93 |
₱86M |
| 2023 | 5 |
₱190M ₱185,194,145.13 |
₱37M |
| 2022 | 3 |
₱170M ₱174,289,828.11 |
₱58M |
Projects by Region
Zamboanga Peninsula
15 projects₱960M
₱963,825,023.17
Top 10 Provinces
1
8
Zamboanga Del Norte
₱630M
₱631,596,313.27
2
4
Zamboanga Sibugay
₱250M
₱251,182,953.76999998
3
3
Zamboanga Del Sur
₱81M
₱81,045,756.13
Top 10 Projects by Contract Value
1
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULIRAN RIVER, PULIRAN BR. SECTION PACKAGE 2, SIBUCO, Zamboanga Del Norte
24J00157
Ongoing
Sibuco, Zamboanga Del Norte
₱160M
₱163,979,287.07
2
CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (DOWNSTREAM), SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 2
24J00034
Completed
Siocon, Zamboanga Del Norte
₱140M
₱137,927,747.5
3
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, Zamboanga Del Norte, PACKAGE 1
24J00032
Ongoing
Salug, Zamboanga Del Norte
₱130M
₱128,789,278.7
4
Construction of Riverwall, Barangay Balagon, Siay, Zamboanga Sibugay
P00630474MN
Completed
Siay, Zamboanga Sibugay
₱96M
₱96,039,900.6
5
Construction of Riverwall along the Sibuguey River, Barangay Minsulao to Barangay Paruk (Phase II), Siay, Zamboanga Sibugay
P00820243MN
Completed
Ipil, Zamboanga Sibugay
₱59M
₱58,599,948.87
6
Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream), Barangay Sampoli A, Diplahan, Zamboanga Sibugay (Package 1)
P00721228MN
Completed
Sampoli A, Diplahan, Zamboanga Sibugay
₱58M
₱57,843,164.86
7
Construction of Flood Control Structure along Palandok River at Polandok Br. (Downstream - Salug Side), Salug, Zamboanga del Norte
P00820391MN
Completed
Poblacion, Salug, Zamboanga Del Norte
₱44M
₱44,100,000.0
8
Construction of Flood Control Structure at Anongan River, Anongan, Sibuco, Zamboanga del Norte
P00721361MN
Completed
Anongan, Sibuco, Zamboanga Del Norte
₱44M
₱44,100,000.0
9
Construction of Shore Protection at Busugan Section, Barangay Sinubong, Zamboanga City, Zamboanga del Sur
P00631082MN
Completed
City of Zamboanga, Zamboanga Del Sur
₱40M
₱39,549,988.07
10
Construction of Flood Control Structure at Piacan River, Sirawai, Zamboanga del Norte
P00721362MN
Completed
Piacan, Sirawai, Zamboanga Del Norte
₱39M
₱39,200,000.0
Projects by Type
Main Portal
15 projects
₱960M