L.S.D. CONSTRUCTION & SUPPLIES
Government Contractor Profile & Statistics
Total Projects
8
Total Value
₱220M
₱217,552,750.13
Avg. Cost
₱27M
Avg. Progress
N/A
Project Status Distribution
Completed
8 projects
(100.0%)
Contract Value by Status
Completed
₱220M
₱217,552,750.13
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2023 | 7 |
₱190M ₱194,385,491.57 |
₱28M |
2022 | 1 |
₱23M ₱23,167,258.56 |
₱23M |
Projects by Region
Central Luzon
3 projects₱120M
₱119,555,014.03
CALABARZON
1 project₱49M
₱49,000,000
Ilocos Region
2 projects₱38M
₱38,167,736.099999994
NCR
1 project₱5.9M
₱5,880,000
Northern Mindanao
1 project₱5M
₱4,950,000
Top 10 Provinces
1
3
Tarlac
₱120M
₱119,555,014.03
2
1
Rizal
₱49M
₱49,000,000
3
2
Pangasinan
₱38M
₱38,167,736.099999994
4
1
Misamis Oriental
₱5M
₱4,950,000
Top 10 Projects by Contract Value
1
Construction of Reinforced Concrete (Box Culvert Drainage) along Kambal Road, San Mateo, Rizal
P00736622LZ
Completed
San Mateo, Rizal
₱49M
₱49,000,000.0
2
Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Right Dike, Malayep Section, Gerona, Tarlac (Package A)
P00742370LZ
Completed
Malayep, Gerona, Tarlac
₱48M
₱48,435,773.97
3
Rehabilitation of Existing Dike along Rio Chico River (Lara Section, Right Bank), Package 2, La Paz, Tarlac (Sta. 0+569 to Sta. 0+819)
P00727366LZ
Completed
Lara, La Paz, Tarlac
₱48M
₱47,951,981.5
4
ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG CAPAS - SAN JOSE - MAYANTOC - MALACAMPA ROAD, CAPAS, TARLAC
22CK0005
Completed
Capas, Tarlac
₱23M
₱23,167,258.56
5
Construction of Slope Protection Works along Baldakit Creek, barangay Manzon-Cacaritan-Pagal, San Carlos City, Pangasinan
P00726087LZ
Completed
Manzon, City of San Carlos, Pangasinan
₱19M
₱19,136,072.4
6
Construction of Slope Protection Works along Caba Creek, barangay Ilang, San Carlos City, Pangasinan
P00726084LZ
Completed
Ilang, City of San Carlos, Pangasinan
₱19M
₱19,031,663.7
7
Construction of Box Culvert along Xyris Creek, Makati City
P00725976LZ
Completed
City of Makati
₱5.9M
₱5,880,000.0
8
Construction of Flood Control Structure, Barangay Poblacion, Lugait, Misamis Oriental
P00732487MN
Completed
Poblacion, Lugait, Misamis Oriental
₱5M
₱4,950,000.0
Projects by Type
Main Portal
8 projects
₱220M