Total Projects

25

Total Value

₱1.7B

₱1,730,717,029.42

Avg. Cost

₱69M

Avg. Progress

N/A

Project Status Distribution

Completed
24 projects (96.0%)
Incomplete
1 projects (4.0%)

Contract Value by Status

Completed

₱1.7B

₱1,686,617,029.42

Incomplete

₱44M

₱44,100,000.0

Yearly Statistics

Year Projects Total Value Average Cost
2024 8

₱890M

₱892,095,259.41

₱110M
2023 1

₱44M

₱44,100,000.0

₱44M
2022 16

₱790M

₱794,521,770.01

₱50M

Projects by Region

NCR

15 projects

₱1.2B

₱1,222,529,813.18

Central Luzon

10 projects

₱510M

₱508,187,216.24

Top 10 Provinces

1

Bulacan

10

₱510M

₱508,187,216.24

Top 10 Projects by Contract Value

1

Construction of Slope Protection Structure along C-6 Open Channel, (Phase 3), Taguig City

P00821072LZ Completed City of Taguig

₱140M

₱141,854,632.5

2

Construction of Slope Protection Structure along C-6 Open Channel, (Phase 1), Taguig City

P00821070LZ Completed Hagonoy, City of Taguig

₱140M

₱141,811,101.2

3

Construction of Slope Protection Structure along C-6 Open Channel, (Phase 2), Taguig City

P00821071LZ Completed City of Taguig

₱140M

₱141,782,110.5

4

Construction of Riverbank Protection Structure along Angat River, Barangay Cambaog, Bustos, Bulacan

P00821267LZ Completed Cambaog, Bustos, Bulacan

₱96M

₱96,499,726.23

5

CONSTRUCTION OF RIVER PROTECTION - MALUMOT, PAOMBONG, BULACAN

22CC0058 Completed Paombong, Bulacan

₱96M

₱96,498,200.7

6

Construction of Slope Protection along C-6 Open Channel (Phase 11), Taguig City

P00821047LZ Completed Lower Bicutan, City of Taguig

₱95M

₱94,569,472.4

7

Construction of Reinforced Concrete Box Culvert along 8th Street, Caloocan City

P00820063LZ Completed Barangay 88, City of Caloocan

₱94M

₱94,183,044.21

8

Construction of Slope Protection along Pinagsama River, Taguig City (Phase 4)

P00821063LZ Completed Pinagsama, City of Taguig

₱91M

₱90,709,571.71

9

Construction of Slope Protection along Pinagsama River, Taguig City (Phase 3)

P00821062LZ Completed Pinagsama, City of Taguig

₱91M

₱90,685,600.66

10

Improvement of Flood Control River Wall along Left Bank of Polo River, Barangay Wawang Pulo, Valenzuela City

P00620081LZ Completed Wawang Pulo, City of Valenzuela

₱90M

₱89,832,638.99

Projects by Type

Main Portal

25 projects

₱1.7B

Comments & Discussion

Loading comments...

Data Source

Powered by official government infrastructure monitoring data

Project DIME

Digital Imaging for Monitoring and Evaluation

A digital transformation initiative by the Department of Budget and Management (DBM) in partnership with the Philippine Open Government Partnership, relaunched in 2023 to enable participatory and real-time monitoring of government infrastructure projects.

How It Works

Advanced Monitoring: Uses satellites, drones, and geotagging technologies to track high-value infrastructure projects nationwide

Citizen Participation: Empowers Filipinos to monitor project progress and provide feedback on actual project status

Enhanced Transparency: Ensures public funds are used effectively through open data and real-time project monitoring

Mission

Provide an efficient mechanism for monitoring and evaluation of government programs through innovative use of technologies

Vision

Integrate science-based monitoring and evaluation principles into the government's budget and management system

"Project DIME is a game-changer—ensuring greater efficiency, transparency, and public participation in the way services are delivered to the Filipino people."

Secretary Amenah F. Pangandaman

DBM Secretary

Learn more about Project DIME
Visit Official Site