Back
Contractor Profile
J.G. ORANZA CONSTRUCTION
Government Contractor Profile & Statistics
Total Projects
20
Total Value
₱1.6B
₱1,573,992,592.1
Avg. Cost
₱79M
Avg. Progress
N/A
Project Status Distribution
Completed
20 projects
(100.0%)
Contract Value by Status
Completed
₱1.6B
₱1,573,992,592.1
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2024 | 8 |
₱820M ₱815,092,105.12 |
₱100M |
| 2023 | 5 |
₱340M ₱343,009,964.54 |
₱69M |
| 2022 | 7 |
₱420M ₱415,890,522.44 |
₱59M |
Projects by Region
SOCCSKSARGEN
20 projects₱1.6B
₱1,573,992,592.1
Top 10 Provinces
1
11
South Cotabato
₱830M
₱825,862,308.14
2
9
Sarangani
₱750M
₱748,130,283.96
Top 10 Projects by Contract Value
1
Construction of Concrete Revetment, Downstream of Sinawal Bridge, Sinawal River, Barangay Labangal, General Santos City
P00820325MN
Completed
Labangal, City of General Santos, South Cotabato
₱120M
₱120,624,229.7
2
Construction of River Bank Protection, Lusanes, Brgy. Sulit, Polomolok, South Cotabato
P00820923MN
Completed
Sulit, Polomolok, South Cotabato
₱120M
₱120,624,048.8
3
Construction of Badtasan River Flood Control, Kiamba, Sarangani
P00833570MN
Completed
Badtasan, Kiamba, Sarangani
₱99M
₱98,999,858.7
4
Construction of Latian Flood Control, Alabel, Sarangani
P00820098MN
Completed
Alabel, Sarangani
₱96M
₱96,499,943.24
5
Construction of Concrete Revetment Lower Klinan-Mabuhay (Silway River Basin), Sta. 0+000 - Sta. 0+694, Brgy. Mabuhay, General Santos City
P00620238MN
Completed
Mabuhay, City of General Santos, South Cotabato
₱96M
₱96,498,596.33
6
Construction of Lun Masla River (Upstream) Flood Control, Malapatan Sarangani
P00835805MN
Completed
Lun Masla, Malapatan, Sarangani
₱96M
₱96,497,759.33
7
Construction of Daan Suyan-Lun Padidu River Control, Package A, Malapatan, Sarangani
P00721306MN
Completed
Lun Padidu, Malapatan, Sarangani
₱96M
₱96,480,601.49
8
Construction of Flood Control Structure along Barangay Maribulan, Alabel, Sarangani
P00835802MN
Completed
Maribulan, Alabel, Sarangani
₱96M
₱96,445,530.38
9
Construction of Concrete Revetment along Silway River, Barangay Apopong, General Santos City
P00821202MN
Completed
Apopong, City of General Santos, South Cotabato
₱96M
₱96,400,433.63
10
Construction of Revetment along Tinagacan-Buayan River (Phase 3), Brgy. Tinagacan, General Santos City
P00630530MN
Completed
Tinagacan, City of General Santos, South Cotabato
₱92M
₱91,629,683.47
Projects by Type
Main Portal
20 projects
₱1.6B
Comments & Discussion
Loading comments...