Back
Contractor Profile
J.H.R. ENTERPRISES
Government Contractor Profile & Statistics
Total Projects
13
Total Value
₱620M
₱622,208,267.06
Avg. Cost
₱48M
Avg. Progress
N/A
Project Status Distribution
Completed
13 projects
(100.0%)
Contract Value by Status
Completed
₱620M
₱622,208,267.06
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2024 | 3 |
₱190M ₱193,310,749.23 |
₱64M |
| 2023 | 4 |
₱250M ₱254,815,977.14 |
₱64M |
| 2022 | 6 |
₱170M ₱174,081,540.69 |
₱29M |
Projects by Region
Northern Mindanao
4 projects₱180M
₱182,196,545.15
Central Luzon
3 projects₱170M
₱171,274,274.25
Davao Region
2 projects₱160M
₱157,791,702.89
CALABARZON
1 project₱42M
₱42,347,638.77
MIMAROPA Region
2 projects₱39M
₱39,198,109.0
Eastern Visayas
1 project₱29M
₱29,399,997
Top 10 Provinces
1
4
Camiguin
₱180M
₱182,196,545.15
2
2
Tarlac
₱120M
₱121,780,569.42
3
1
Davao Del Sur
₱90M
₱90,243,232.16
4
1
Davao Oriental
₱68M
₱67,548,470.73
5
1
Pampanga
₱49M
₱49,493,704.83
6
1
Rizal
₱42M
₱42,347,638.77
7
1
Leyte
₱29M
₱29,399,997
8
1
Occidental Mindoro
₱24M
₱24,499,178.88
9
1
Marinduque
₱15M
₱14,698,930.12
Top 10 Projects by Contract Value
1
Construction of River Control along Bugang Bridge, Sagay, Camiguin
P00820910MN
Completed
Bugang, Sagay, Camiguin
₱95M
₱94,561,570.35
2
Construction of Flood Control Structure Outfall to Digos-Makar Road, Sulop, Davao del Sur
P00721576MN
Completed
Poblacion, Sulop, Davao Del Sur
₱90M
₱90,243,232.16
3
Construction of Slope Protection Structure along Tarlac River (Left Dike), Brillante-Aduas Section, Package J, Paniqui, Tarlac
P00820261LZ
Completed
Brillante, Paniqui, Tarlac
₱74M
₱74,250,000.0
4
Construction of Flood Mitigation Structure along Cateel River (Barangay Central), Sta. 0 + 000 - Sta. 0 + 540, Cateel, Davao Oriental
P00721285MN
Completed
Cateel, Davao Oriental
₱68M
₱67,548,470.73
5
Construction of Slope Protection with Groundsill Along Quitangil Creek, Bgy Sto Niño, Magalang, Pampanga (Section Left And Right Side)
P00742363LZ
Completed
Santo Niño, Magalang, Pampanga
₱49M
₱49,493,704.83
6
Construction of Tupsan River Control along Tupsan Bridge, K9+000 - K9+561 Bothsides, Mambajao, Camiguin
P00620137MN
Completed
Tupsan, Mambajao, Camiguin
₱49M
₱49,000,000.0
7
Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River (Right Dike), Colibangbang to Rang-Ayan Section (Package A), Paniqui, Tarlac
P00736619LZ
Completed
Colibangbang, Paniqui, Tarlac
₱48M
₱47,530,569.42
8
Construction of Flood Control Structure at Angono River, Barangay San Vicente (Package 2), Angono, Rizal
P00632910LZ
Completed
San Vicente, Angono, Rizal
₱42M
₱42,347,638.77
9
Construction of Owak Flood Control, Ormoc City, Leyte
P00620195VS
Completed
Ormoc City, Leyte
₱29M
₱29,399,997.0
10
Construction of Flood Control Structure along Pandurucan Riverbank, Brgy. Pag-asa, Sablayan, Occidental Mindoro
P00824746LZ
Completed
Pag-Asa, Sablayan, Occidental Mindoro
₱24M
₱24,499,178.88
Projects by Type
Main Portal
13 projects
₱620M
Comments & Discussion
Loading comments...