Back
Contractor Profile
JAICA CONST. CORP
Government Contractor Profile & Statistics
Total Projects
31
Total Value
₱2.1B
₱2,101,363,536.27
Avg. Cost
₱68M
Avg. Progress
N/A
Project Status Distribution
Completed
31 projects
(100.0%)
Contract Value by Status
Completed
₱2.1B
₱2,101,363,536.27
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2024 | 6 |
₱300M ₱296,190,879.5 |
₱49M |
2023 | 8 |
₱560M ₱556,723,620.29 |
₱70M |
2022 | 11 |
₱780M ₱777,040,763.25 |
₱71M |
2021 | 6 |
₱470M ₱471,408,273.23 |
₱79M |
Projects by Region
Northern Mindanao
22 projects₱1.7B
₱1,653,300,081.27
Eastern Visayas
5 projects₱380M
₱384,263,455
CALABARZON
3 projects₱34M
₱34,400,000
Western Visayas
1 project₱29M
₱29,400,000
Top 10 Provinces
1
15
Misamis Oriental
₱1.3B
₱1,319,883,460.46
2
5
Leyte
₱380M
₱384,263,455
3
4
Camiguin
₱200M
₱200,202,195.36
4
3
Bukidnon
₱130M
₱133,214,425.45
5
3
Quezon
₱34M
₱34,400,000
6
1
Iloilo
₱29M
₱29,400,000
Top 10 Projects by Contract Value
1
Construction of Flood Control Project along Dangoan River (Downstream), K0+000.00 - K0+397.966, K0+767.565 - K1+101.000, Medina, Misamis Oriental
P00620029MN
Completed
Medina, Misamis Oriental
₱130M
₱126,308,189.9
2
Construction of Single Barrel Diversion Drainage Line Connecting the Existing Bitan-ag Channel at LKKS to Diversion Drainage Line along BCIR and Agora Terminal Road, Lapasan, C.M. Recto - Limketkai Section, Cagayan de Oro City
P00522075MN
Completed
Lapasan, City of Cagayan De Oro, Misamis Oriental
₱110M
₱114,875,026.6
3
Construction of Flood Control Structure along Dangoan River, Package 1, Medina, Misamis Oriental
P00721258MN
Completed
Medina, Misamis Oriental
₱110M
₱113,079,596.3
4
Rehabilitation of Flood Control Structure, Kolambog Creek, Package 27, Sta. 0+000.00 - Sta. 0+787.562, Sta. 1+113.581 - Sta. 1+173.794, Lapasan, Cagayan de Oro City
P00620050MN
Completed
Lapasan, City of Cagayan De Oro, Misamis Oriental
₱110M
₱112,903,335.6
5
Rehabilitation of Tributary Channel (Upstream Area), Package 25, Incl. Channelization, Sta. 0+000.00 - Sta. 0+420.996 (Alignment 1), Sta. 0+000.00 - Sta. 0+115.410 (Alignment 2), Sta. 0+868.400 - Sta. 1+103.000 (Alignment 3), Sta. 0+000.00 - Sta. 0+083.220 (Alignment 4), Cagayan de Oro City
P00620053MN
Completed
City of Cagayan De Oro, Misamis Oriental
₱110M
₱112,325,644.9
6
Construction of Flood Control Structure along Binahaan River, Barangay Cahumayhumayan, Tanauan, Leyte
P00721793VS
Completed
Cahumayhumayan, Tanauan, Leyte
₱110M
₱106,000,000.0
7
Rehabilitation of Flood Control Structure, Bitan-ag Creek (Upstream Section), Package 19, Sta. 0+456.70 - Sta. 0+668.30, Cagayan de Oro City
P00620047MN
Completed
City of Cagayan De Oro, Misamis Oriental
₱100M
₱102,965,502.4
8
Construction of Flood Control Structure, Barangay Libtong, San Miguel, Leyte
P00820899VS
Completed
Libtong, San Miguel, Leyte
₱96M
₱96,434,585.0
9
Construction of Drainage Channel from BCIR to Iponan River, Package 6, Bulua, Cagayan de Oro City
P00522056MN
Completed
Bulua, City of Cagayan De Oro, Misamis Oriental
₱96M
₱96,179,476.23
10
Construction of Flood Control Structure, Phase 3, Camansihay, Tacloban City, Leyte
P00721918VS
Completed
City of Tacloban, Leyte
₱96M
₱96,096,605.0
Projects by Type
Main Portal
31 projects
₱2.1B
Comments & Discussion
Loading comments...