Contractor Profile
G.F. FABIAN CONSTRUCTION
Government Contractor Profile & Statistics
Total Projects
16
Total Value
₱1.1B
₱1,067,628,544.49
Avg. Cost
₱67M
Avg. Progress
N/A
Project Status Distribution
Completed
14 projects
(87.5%)
Incomplete
1 projects
(6.3%)
Ongoing
1 projects
(6.3%)
Contract Value by Status
Completed
₱950M
₱949,539,659.1700001
Incomplete
₱95M
₱94,814,590.39
Ongoing
₱23M
₱23,274,294.93
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2024 | 5 |
₱460M ₱461,258,308.68 |
₱92M |
2023 | 8 |
₱550M ₱549,586,069.75 |
₱69M |
2022 | 2 |
₱34M ₱33,509,871.13 |
₱17M |
Projects by Region
NCR
10 projects₱630M
₱632,898,484.39
Central Luzon
3 projects₱340M
₱337,747,977.6
CALABARZON
3 projects₱97M
₱96,982,082.5
Top 10 Provinces
1
3
Bulacan
₱340M
₱337,747,977.6
2
2
Rizal
₱58M
₱58,010,557.56
3
1
Cavite
₱39M
₱38,971,524.94
Top 10 Projects by Contract Value
1
Construction of Flood Control Structure, Sta. 00+208 - Sta. 00+312 (Tawiran-Paliwas Section), Obando, Bulacan
P00820233LZ
Completed
Tawiran, Obando, Bulacan
₱140M
₱144,749,905.8
2
Construction of Flood Control Structure, Sta. 00+312 - Sta. 00+416 (Tawiran-Paliwas Section), Obando, Bulacan
P00820234LZ
Completed
Tawiran, Obando, Bulacan
₱140M
₱144,749,071.8
3
Improvement of Harbor View Pumping Station, South Dr. Ermita, Manila City Phase II
P00726794LZ
Completed
Barangay 394, City of Manila
₱96M
₱96,495,833.14
4
Construction of Retention Basin at Estero dela Reina, (Phase XIII), Tondo, Manila City
P00740281LZ
Completed
Barangay 96, City of Manila
₱96M
₱96,445,697.36
5
Construction of Retention Basin at Estero dela Reina, (Phase XII), Tondo, Manila City
P00740280LZ
Completed
Barangay 20, City of Manila
₱96M
₱96,219,232.12
6
Construction of Retention Basin at Estero dela Reina (Phase XV), Tondo, Manila
P00726775LZ
Incomplete
City of Manila
₱95M
₱94,814,590.39
7
Construction of Drainage along Anonas St., Manila City
P00820010LZ
Completed
City of Manila
₱67M
₱67,202,179.61
8
Construction of Booster Pumping Station Along Estero de Tripa de Gallina, Pedro Gil Street, Barangay 869, Manila City Phase I
P00820007LZ
Completed
City of Manila
₱56M
₱55,557,185.69
9
Construction of Flood Control Structure, Cainta River, Barangay San Roque, Cainta, Rizal
P00820941LZ
Completed
San Roque, Cainta, Rizal
₱49M
₱48,999,965.78
10
Rehabilitation of Flood Control Wall along Meycauayan River, Barangay Tawiran to Wawang Pulo (Section I), Obando Section, Obando, Bulacan
P00727296LZ
Completed
Tawiran, Obando, Bulacan
₱48M
₱48,249,000.0
Projects by Type
Main Portal
16 projects
₱1.1B