Contractor Profile
GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO
Government Contractor Profile & Statistics
Total Projects
18
Total Value
₱1.1B
₱1,103,803,746.35
Avg. Cost
₱61M
Avg. Progress
N/A
Project Status Distribution
Completed
17 projects
(94.4%)
Ongoing
1 projects
(5.6%)
Contract Value by Status
Completed
₱1.1B
₱1,062,733,637.85
Ongoing
₱41M
₱41,070,108.5
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2025 | 1 |
₱41M ₱41,070,108.5 |
₱41M |
| 2024 | 3 |
₱200M ₱202,798,860.49 |
₱68M |
| 2023 | 2 |
₱150M ₱154,791,496.0 |
₱77M |
| 2022 | 12 |
₱710M ₱705,143,281.36 |
₱59M |
Projects by Region
Central Luzon
14 projects₱660M
₱664,072,797.55
Cagayan Valley
4 projects₱440M
₱439,730,948.8
Top 10 Provinces
1
6
Tarlac
₱470M
₱465,871,028.56
2
4
Cagayan
₱440M
₱439,730,948.8
3
8
Aurora
₱200M
₱198,201,768.99
Top 10 Projects by Contract Value
1
Construction of Gen. E. Batalla Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 550, Camalaniugan, Cagayan
P00630933LZ
Completed
Camalaniugan, Cagayan
₱140M
₱143,859,986.3
2
Construction of Catotoran Norte Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 130, Sta. 0+00 - Sta. 0+057, Sta. 0+000 - Sta. 0+200, Camalaniugan, Cagayan
P00630932LZ
Completed
Catotoran Norte, Camalaniugan, Cagayan
₱140M
₱141,079,466.5
3
Construction of Gen. E. Batalla Flood Control System, Camalaniugan, Cagayan
P00726881LZ
Completed
Camalaniugan, Cagayan
₱110M
₱114,611,496.0
4
Construction of Flood Control Structure along Tarlac River–O'Donnell River, Balanti–Armenia Section (Segment B), Tarlac City
P00821248LZ
Completed
Armenia, City of Tarlac, Tarlac
₱99M
₱99,000,000.0
5
Construction of Flood Control Structure along Tarlac River–O'Donnell River, Balanti–Armenia Section (Segment C), Tarlac City
P00821249LZ
Completed
Armenia, City of Tarlac, Tarlac
₱99M
₱99,000,000.0
6
INSTALLATION OF ROAD SAFETY DEVICES ALONG MANILA NORTH ROAD (BAMBAN AND CAPAS SECTION) CAPAS AND BAMBAN, TARLAC
22CK0038
Completed
Capas, Tarlac
₱94M
₱94,240,682.91
7
INSTALLATION OF SOLAR LED STREET LIGHTS AND ROAD SAFETY DEVICES ALONG TARLAC - ZAMBALES ROAD, CAPAS, TARLAC
22CK0077
Completed
Capas, Tarlac
₱93M
₱93,169,679.22
8
Rehabilitation of Existing Dike along Rio Chico River (Macalong Section, Right Bank), U/S of Rio Chico Bridge, La Paz, Tarlac
P00620851LZ
Completed
Macalong, La Paz, Tarlac
₱73M
₱72,855,158.85
9
CONSTRUCTION OF BICLAT BRIDGE, BRGY. ZARAH, SAN LUIS, AURORA
22CN0070
Completed
San Luis, Aurora
₱58M
₱57,900,000.0
10
NETWORK DEVELOPMENT PROGRAM, OFF- CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, BALER - CASIGURAN RD (BALER - DINADIAWAN), K0281+000 - K0281+1033, K0281+1046 - K0284+511, K0284+628 - K0285+674, K0285+735 - K0286+717, K0286+991 - K0287+753
22CN0023
Completed
Maria Aurora, Aurora
₱42M
₱41,514,760.0
Projects by Type
Main Portal
18 projects
₱1.1B