Back
Contractor Profile
GCADC

G.C.I. CONSTRUCTION AND DEV'T. CORP.

Government Contractor Profile & Statistics

Total Projects

29

Total Value

₱2.6B

₱2,567,974,244.96

Avg. Cost

₱89M

Avg. Progress

N/A

Project Status Distribution

Completed
29 projects (100.0%)

Contract Value by Status

Completed

₱2.6B

₱2,567,974,244.96

Yearly Statistics

Year Projects Total Value Average Cost
2024 5

₱620M

₱616,555,534.4

₱120M
2023 16

₱1.5B

₱1,464,807,541.56

₱92M
2022 8

₱490M

₱486,611,169.0

₱61M

Projects by Region

Bicol Region

28 projects

₱2.5B

₱2,521,444,824.96

CALABARZON

1 project

₱47M

₱46,529,420

Top 10 Provinces

1

Camarines Sur

27

₱2.4B

₱2,415,294,889.26

2

Albay

1

₱110M

₱106,149,935.7

3

Batangas

1

₱47M

₱46,529,420

Top 10 Projects by Contract Value

1

Construction of Bicol River Cut-off Channel 3 Flood Mitigation Structure, Milaor, Camarines Sur

P00726630LZ Completed Milaor, Camarines Sur

₱140M

₱144,268,222.8

2

Construction of Flood Mitigation Structure along Bicol River, Barangay Balaogan Section, Bula, Camarines Sur

P00821392LZ Completed Balaogan, Bula, Camarines Sur

₱140M

₱139,925,000.0

3

Construction of Riverbank Protection along Daraga River, Barangay San Isidro Section, Buhi, Camarines Sur

P00821406LZ Completed San Isidro, Buhi, Camarines Sur

₱140M

₱135,100,000.0

4

Construction of Dike (along Bicol River) within Bicol River Basin, Barangay Del Carmen - Del Rosario, Minalabac, Camarines Sur

P00821377LZ Completed Minalabac, Camarines Sur

₱130M

₱133,169,700.0

5

Construction of Flood Control Structure along Cut-off Channel (Downstream) phase II, Brgy. San Juan-San Lorenzo, Minalabac, Camarines Sur

P00740456LZ Completed Minalabac, Camarines Sur

₱120M

₱120,625,000.0

6

Construction of Flood Control Structure along Cut-off Channel (Downstream), Brgy. Borongborongan, Milaor, Camarines Sur

P00740459LZ Completed Borongborongan, Milaor, Camarines Sur

₱120M

₱120,625,000.0

7

Construction of Pawili River Flood Mitigation Structure (Barangay Causip and Barangay Fabrica), Bula, Camarines Sur

P00726628LZ Completed Causip, Bula, Camarines Sur

₱120M

₱115,659,116.9

8

Construction of Flood Mitigation Structure, Barangay Cotmo, Sipocot, Camarines Sur

P00820481LZ Completed Cotmo, Sipocot, Camarines Sur

₱110M

₱113,974,811.1

9

Construction/ Rehabilitation of Nasisi River Flood Mitigation Structure (Brgy. Mahaba), Ligao City, Albay

P00620306LZ Completed Mahaba, City of Ligao, Albay

₱110M

₱106,149,935.7

10

Construction of Dike along Bicol River, Brgy. Del Carmen-Del Rosario (Phase 2), Minalabac, Camarines Sur

P00736098LZ Completed Minalabac, Camarines Sur

₱97M

₱96,500,000.0

Projects by Type

Main Portal

29 projects

₱2.6B

Comments & Discussion

Loading comments...

Data Source

Powered by official government infrastructure monitoring data

Project DIME

Digital Imaging for Monitoring and Evaluation

A digital transformation initiative by the Department of Budget and Management (DBM) in partnership with the Philippine Open Government Partnership, relaunched in 2023 to enable participatory and real-time monitoring of government infrastructure projects.

How It Works

Advanced Monitoring: Uses satellites, drones, and geotagging technologies to track high-value infrastructure projects nationwide

Citizen Participation: Empowers Filipinos to monitor project progress and provide feedback on actual project status

Enhanced Transparency: Ensures public funds are used effectively through open data and real-time project monitoring

Mission

Provide an efficient mechanism for monitoring and evaluation of government programs through innovative use of technologies

Vision

Integrate science-based monitoring and evaluation principles into the government's budget and management system

"Project DIME is a game-changer—ensuring greater efficiency, transparency, and public participation in the way services are delivered to the Filipino people."

Secretary Amenah F. Pangandaman

DBM Secretary

Learn more about Project DIME
Visit Official Site