Back
Contractor Profile
ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
Government Contractor Profile & Statistics
Total Projects
28
Total Value
₱1.7B
₱1,729,506,365.4
Avg. Cost
₱62M
Avg. Progress
N/A
Project Status Distribution
Completed
28 projects
(100.0%)
Contract Value by Status
Completed
₱1.7B
₱1,729,506,365.4
Yearly Statistics
Year | Projects | Total Value | Average Cost |
---|---|---|---|
2024 | 17 |
₱1.3B ₱1,341,688,579.9 |
₱79M |
2023 | 4 |
₱240M ₱238,861,923.22 |
₱60M |
2022 | 7 |
₱150M ₱148,955,862.28 |
₱21M |
Projects by Region
NCR
10 projects₱620M
₱622,542,076.34
MIMAROPA Region
4 projects₱540M
₱536,438,902.18
Central Luzon
9 projects₱290M
₱293,705,386.88
Central Visayas
4 projects₱180M
₱180,320,000
CALABARZON
1 project₱97M
₱96,500,000
Top 10 Provinces
1
2
Oriental Mindoro
₱440M
₱440,492,782.0
2
6
Bulacan
₱230M
₱230,005,389.12
3
4
Negros Oriental
₱180M
₱180,320,000
4
1
Rizal
₱97M
₱96,500,000
5
2
Marinduque
₱96M
₱95,946,120.18
6
3
Bataan
₱64M
₱63,699,997.76
Top 10 Projects by Contract Value
1
Construction of Road Dike along Bucayao River (East Side), Sitio Malinao Section, Barangay Tagumpay, Naujan, Oriental Mindoro
P00839492LZ
Completed
Tagumpay, Naujan, Oriental Mindoro
₱250M
₱247,496,511.7
2
Construction of Road Dike along Mag-asawang Tubig River, Sitio Dike, Barangay Apitong Section, Naujan, Oriental Mindoro
P00820422LZ
Completed
Apitong, Naujan, Oriental Mindoro
₱190M
₱192,996,270.3
3
Construction of River Capacity Enhancement Structure along Teresa River, Sitio Abuyod, Barangay May-Iba, Teresa, Rizal
P00846095LZ
Completed
May-Iba, Teresa, Rizal
₱97M
₱96,500,000.0
4
Construction of Riverbank Protection Structure along Balagtas River, Barangay Santol, Balagtas, Bulacan
P00838379LZ
Completed
Santol, Balagtas, Bulacan
₱96M
₱96,499,536.28
5
Construction of Flood Control Wall along Sapang Alat Creek, Sta. 3+996 to 4+346, Caloocan City
P00740301LZ
Completed
City of Caloocan
₱94M
₱93,966,981.03
6
Construction of Drainage System along Libertad Main (From Roxas Blvd to Taft Avenue, Pasay City, Sta 0 + 483 to Sta 0 + 644), Phase 6
P00820019LZ
Completed
Barangay 76, Pasay City
₱89M
₱89,057,544.2
7
Construction of Slope Protection along Panday River, (Phase 9), Pateros
P00821057LZ
Completed
Aguho, Pateros
₱71M
₱70,927,423.27
8
Construction of Slope Protection along Panday River, (Phase 7), Pateros, Metro Manila
P00821055LZ
Completed
Aguho, Pateros
₱71M
₱70,920,498.2
9
Construction of Flood Mitigation Structure along Muzon and Dampalit River (Phase 6), Malabon City
P00839458LZ
Completed
Muzon, City of Malabon
₱59M
₱59,397,439.53
10
BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BAMBAN SECTION, PHASE ERD-IHERMOSA, BATAAN
22CA0038
Completed
Hermosa, Bataan
₱49M
₱48,999,998.32
Projects by Type
Main Portal
28 projects
₱1.7B
Comments & Discussion
Loading comments...