A.D. MARRERO GENERAL CONSTRUCTION
Government Contractor Profile & Statistics
Total Projects
6
Total Value
₱230M
₱228,258,298.66
Avg. Cost
₱38M
Avg. Progress
N/A
Project Status Distribution
Completed
4 projects
(66.7%)
Ongoing
2 projects
(33.3%)
Contract Value by Status
Completed
₱180M
₱176,890,053.5
Ongoing
₱51M
₱51,368,245.16
Yearly Statistics
| Year | Projects | Total Value | Average Cost |
|---|---|---|---|
| 2025 | 2 |
₱51M ₱51,368,245.16 |
₱26M |
| 2022 | 4 |
₱180M ₱176,890,053.5 |
₱44M |
Projects by Region
CAR
6 projects₱230M
₱228,258,298.66
Top 10 Provinces
1
6
Abra
₱230M
₱228,258,298.66
Top 10 Projects by Contract Value
1
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE-SECONDARY ROADS, ABRA-KALINGA RD-K0451+812-K0454+000, K0461+360-K0463+000, K0465+680-K0467+000, K0477+000-K0477+324
310102101979000
Ongoing
Lagangilang, Abra
₱51M
₱50,877,524.7
2
Construction of Madao - Bulbulala Flood Control, Barangay Bulbulala, Licuan-Baay, Abra
P00632768LZ
Completed
Bulbulala, Licuan-Baay, Abra
₱49M
₱49,497,000.0
3
Construction of Flood Control Structure along Abra River, Sta. 25+800 -Sta. 26+300, Cabaruyan, Daguioman, Abra
P00620986LZ
Completed
Cabaruyan, Daguioman, Abra
₱49M
₱48,997,988.0
4
Construction of Flood Control/Drainage Canal along South-North - Labon-San Miguel-Bangcagan, Bucay, Abra
P00637059LZ
Completed
Labon, Bucay, Abra
₱49M
₱48,997,065.5
5
Construction of Patoc Flood Control Structure (Phase III), Sta. 0+600 - Sta. 1+100, Bucay, Abra
P00631101LZ
Completed
Patoc, Bucay, Abra
₱29M
₱29,398,000.0
6
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, ABRA-ILOCOS SUR RD-K0387+(-160)-K0387+(-129)
310105101369000
Ongoing
Lagangilang, Abra
₱490K
₱490,720.46
Projects by Type
Main Portal
6 projects
₱230M