Government Contractor Profile & Statistics

Total Projects

39

Total Value

₱1.6B

₱1,612,889,843.76

Avg. Cost

₱41M

Avg. Progress

N/A

Project Status Distribution

Completed
23 projects (59.0%)
Incomplete
2 projects (5.1%)
Ongoing
14 projects (35.9%)

Contract Value by Status

Completed

₱1.3B

₱1,321,322,375.1

Ongoing

₱270M

₱274,711,668.64

Incomplete

₱17M

₱16,855,800.02

Yearly Statistics

Year Projects Total Value Average Cost
2025 16

₱290M

₱291,567,468.66

₱18M
2024 2

₱69M

₱68,501,581.1

₱34M
2023 1

₱140M

₱144,747,500.0

₱140M
2022 20

₱1.1B

₱1,108,073,294.0

₱55M

Projects by Region

CAR

34 projects

₱1.3B

₱1,337,332,004.72

Ilocos Region

5 projects

₱280M

₱275,557,839.04

Top 10 Provinces

1

Abra

34

₱1.3B

₱1,337,332,004.72

2

Ilocos Sur

5

₱280M

₱275,557,839.04

Top 10 Projects by Contract Value

1

Construction of Toon-San Gregorio Flood Control Structure, La Paz, Abra

P00740305LZ Completed San Gregorio, La Paz, Abra

₱140M

₱144,747,500.0

2

Construction of Toon-San Gregorio Flood Control, La Paz, Abra

P00637009LZ Completed San Gregorio, La Paz, Abra

₱96M

₱96,497,000.0

3

Construction of Flood Control Structure, Coribot, Barangay Mudeng, La Paz, Abra

P00639322LZ Completed Mudeng, La Paz, Abra

₱94M

₱94,102,968.2

4

Construction of Soot Flood Control Structure, La Paz, Abra

P00637010LZ Completed Mudeng, La Paz, Abra

₱92M

₱92,109,279.1

5

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, ABRA-ILOCOS NORTE RD-K0432+000-K0435+000

310106101225000 Ongoing Cervantes, Ilocos Sur

₱91M

₱91,256,451.04

6

Construction of San Antonio River Control Structure, Barangay San Antonio, Narvacan, Ilocos Sur

P00620129LZ Completed San Antonio, Narvacan, Ilocos Sur

₱87M

₱86,849,854.5

7

Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra

P00632771LZ Completed Pagala, Bucay, Abra

₱49M

₱49,498,000.0

8

Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra

P00632756LZ Completed Bangcagan, Bucay, Abra

₱49M

₱49,498,000.0

9

Construction of Mudeng Flood Control Structure (Phase 3), Barangay Mudeng, La Paz, Abra

P00632770LZ Completed Mudeng, La Paz, Abra

₱49M

₱49,497,500.0

10

Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra

P00632762LZ Completed Deet, Tayum, Abra

₱49M

₱49,497,500.0

Projects by Type

Main Portal

39 projects

₱1.6B

Comments & Discussion

Loading comments...

Data Source

Powered by official government infrastructure monitoring data

Project DIME

Digital Imaging for Monitoring and Evaluation

A digital transformation initiative by the Department of Budget and Management (DBM) in partnership with the Philippine Open Government Partnership, relaunched in 2023 to enable participatory and real-time monitoring of government infrastructure projects.

How It Works

Advanced Monitoring: Uses satellites, drones, and geotagging technologies to track high-value infrastructure projects nationwide

Citizen Participation: Empowers Filipinos to monitor project progress and provide feedback on actual project status

Enhanced Transparency: Ensures public funds are used effectively through open data and real-time project monitoring

Mission

Provide an efficient mechanism for monitoring and evaluation of government programs through innovative use of technologies

Vision

Integrate science-based monitoring and evaluation principles into the government's budget and management system

"Project DIME is a game-changer—ensuring greater efficiency, transparency, and public participation in the way services are delivered to the Filipino people."

Secretary Amenah F. Pangandaman

DBM Secretary

Learn more about Project DIME
Visit Official Site